Business-Jobs-Industry-Construction (122 images)
-

Elevator shaft_1.jpg
Repairman works on an elevator shaft
-

Networking.jpg
Two women network during a break between...
-

6304.jpg
Phase 1 of a three phase 5 megawatt solar...
-

6286.jpg
Phase 1 of a three phase 5 megawatt solar...
-

6181.jpg
Phase 1 of a three phase 5 megawatt solar...
-

ShoeShoeSolarArray_25.jpg
750-kilowatt solar array on the roof of a Shoe...
-

ShoeShoeSolarArray_23.jpg
750-kilowatt solar array on the roof of a Shoe...
-

ShoeShoeSolarArray_21.jpg
750-kilowatt solar array on the roof of a Shoe...
-

ShoeShoeSolarArray_16.jpg
First phase is complete, second phase in...
-

ShoeShoeSolarArray_05.jpg
First phase is complete, second phase in...
-

ShoeShoeSolarArray_03.jpg
First phase is complete, second phase in...
-

ShoeShoeSolarArray_02.jpg
First phase is complete, second phase in...
-

SunEnergy_08.jpg
Shoe Show corporate headquarters' million...
-

Siemens_43.jpg
These are various views of the SGT-8000H gas...
-

Siemens_42.jpg
These are various views of the SGT-8000H gas...
-

Siemens_41.jpg
This is the SGT-8000H assembly area. Note the...
-

Siemens_40.jpg
This is the SGT-8000H assembly area. Note the...
-

Siemens_39.jpg
These are various views of the SGT-8000H gas...
-

Siemens_38.jpg
These are various views of the SGT-8000H gas...
-

Siemens_37.jpg
These are various views of the SGT-8000H gas...
-

Siemens_33.jpg
These are discs from an existing turbine which...
-

Siemens_32.jpg
This is the first disc manufactured at the...
-

Siemens_21.jpg
Unveiling and display of the first SGT-8000H...
-

0210_AppleServer_04.jpg
Apple server farm at US Hwy 321 and Startown...
-

0210_AppleServer_003.jpg
Apple server farm at US Hwy 321 and Startown...

